Service

LEVEL 1

One (1) Visit per Year – Annual Visit 
Includes oil change, oil and fuel filter replacement, point-to-point inspection and functional tests.

LEVEL 2

Two (2) Visits per Year – Annual & Semi-Annual Visit
1st visit includes oil change, oil and fuel filter replacement, point-to-point inspection and functional tests.
2nd visit includes point-to-point inspection and functional tests.

LEVEL 4

Four (4) Visits per Year – Annual, Semi- Annual & Quarterly Visit
1st visit includes oil change, oil and fuel filter replacement, point-to-point inspection, and functional tests.
 2nd visit includes point-to-point inspection and functional tests.
Quarterly visits include visual inspection and run tests.

LEVEL 12

Twelve (12) Visits per Year – Annual, Semi-Annual & Monthly Visits 
1st visit includes oil change, oil and fuel filter replacement, point-to-point inspection, and functional tests.
2nd visit includes point-to-point inspection and functional tests.
Monthly visits include visual inspections and run tests.

LOAD BANKING

The purpose of load banking your backup power generators is multilayer. First, it ensures that your generator is capable of handling your facility’s load in emergency situations. Second, it is a maintenance tool, used to not only diagnose any potential problems, but also to prevent future problems caused by running engines under stressed conditions as to have the problems present themselves during the testing period. Engine manufacturers recommend load bank testing in an annual basis.

Rentals

Have a generator that is under repair? Just need backup power for a period of time. We can deliver a rental for the time frame needed. We will then come pick it up upon the completion of your project/needs.